It was realized early by Weber that light-weight construction is of great value to the future. In light of the continually-advancing fiber-components of the racing scene, a suitable procedure was sought-out to reproduce the advantages of this technique for large-lot production.
1996 |
The first ideas emerge |
1998 |
Acquire Laboratory Equipment for the E-LFT Process |
2001 |
Start of Pilot Production System |
2004 |
First Serial-production order |
2006 |
SOP large-volume |






